Saltar para: Posts [1], Pesquisa e Arquivos [2]



corruptos

por Sérgio de Almeida Correia, em 30.11.20

"We were planning to build an above-ground high-speed railway, connecting the one from Zhuhai on the northern border, across the Macau city proper, to Taipa, connected to the one on Hengqin Island further to the western part of the Pearl River Delta. This project was shelved by the Chui Sai On administration, as it involved a lot of corruption and needed to be refurbished and restarted, in close cooperation with the authorities of the Great Pearl River Basin Area. It is easier to construct it now, since the PRC is very advanced in constructing such projects nowadays.

Autoria e outros dados (tags, etc)




Mais sobre mim

foto do autor


Pesquisar

  Pesquisar no Blog



Calendário

Novembro 2020

D S T Q Q S S
1234567
891011121314
15161718192021
22232425262728
2930



Arquivo

  1. 2022
  2. J
  3. F
  4. M
  5. A
  6. M
  7. J
  8. J
  9. A
  10. S
  11. O
  12. N
  13. D
  14. 2021
  15. J
  16. F
  17. M
  18. A
  19. M
  20. J
  21. J
  22. A
  23. S
  24. O
  25. N
  26. D
  27. 2020
  28. J
  29. F
  30. M
  31. A
  32. M
  33. J
  34. J
  35. A
  36. S
  37. O
  38. N
  39. D
  40. 2019
  41. J
  42. F
  43. M
  44. A
  45. M
  46. J
  47. J
  48. A
  49. S
  50. O
  51. N
  52. D
  53. 2018
  54. J
  55. F
  56. M
  57. A
  58. M
  59. J
  60. J
  61. A
  62. S
  63. O
  64. N
  65. D
  66. 2017
  67. J
  68. F
  69. M
  70. A
  71. M
  72. J
  73. J
  74. A
  75. S
  76. O
  77. N
  78. D
  79. 2016
  80. J
  81. F
  82. M
  83. A
  84. M
  85. J
  86. J
  87. A
  88. S
  89. O
  90. N
  91. D
  92. 2015
  93. J
  94. F
  95. M
  96. A
  97. M
  98. J
  99. J
  100. A
  101. S
  102. O
  103. N
  104. D
  105. 2014
  106. J
  107. F
  108. M
  109. A
  110. M
  111. J
  112. J
  113. A
  114. S
  115. O
  116. N
  117. D
  118. 2013
  119. J
  120. F
  121. M
  122. A
  123. M
  124. J
  125. J
  126. A
  127. S
  128. O
  129. N
  130. D



Posts mais comentados